Facilities are custom designed and built to suit the specific needs and capacity requirements, allowing flexible operation for all situations. The result is a centralised solution, with the ability to incorporate resource recovery.
Key components of the large-scale facilities include:
Additionally, for facilities larger than 50 tonnes per day, co-processing is introduced by anaerobically digesting the waste and collecting the gases for energy.
Co-processing combines the benefits of aerobic and anaerobic treatments to create a circular system. The biogas produced can be supplied back to the facility, resulting in low energy consumption.
All our solutions are highly customisable to suit your needs and comply with the local legislation standards and requirements.
Enterpack Ltd is the UK & Ireland distributor for Oklin International Company No. 02742003 VAT No. GB 919 6679 65
All Rights Reserved | Enterpack Ltd.